Skip to main content
ULI SPRING MEETING ULI SPRING MEETING
Colorado Convention Center, Denver, CO, United States May 12-14, 2025

A Post-Industrial Waterfront Reimagined

Tue Apr 09 9:00 AM — 12:00 PM (GMT-05:00) Eastern Time

For over one hundred years, the Greenpoint waterfront in Brooklyn was a functioning lumberyard and industrial center. In 2005 the Greenpoint-Williamsburg Waterfront Rezoning connected the waterfront to the long-establish Greenpoint neighborhood, including acres of publicly accessible open space and waterfront promenades. One of the largest development sites along the waterfront is Greenpoint Landing – a 22-acre site situated along a half-mile of East River waterfront being master-planned and developed by Park Tower Group. When complete, Greenpoint Landing will include about 5,500 apartments (including much-needed affordable units), a sprawling waterfront park designed by Field Operations, a new school, and numerous local retail opportunities. In a joint venture, Park Tower Group and Brookfield Properties developed a total of 2,000 units across four development sites, including One Blue Slip (2018), Two Blue Slip (2020) and The BellSlip (2022), all designed by Handel Architects and Eagle & West (2022) designed by OMA. Park Tower Group joint ventured with L&M Development Partners on three stand-alone affordable buildings - 33 Eagle, 5 Blue Slip and 7 Bell Slip – all designed by Handel Architects, and with Rockefeller Group on The Dupont, designed by GKV Architects, which is the latest building to be constructed at Greenpoint Landing. This past summer, Park Tower Group unveiled their 374-unit fully affordable building at 35 Commercial Street, also designed by Handel Architects.